AVRWC main projects through 2018 (2014)

AVRWC has spent more than $$14,705,752 in system upgrades since 2013, with more upgrades in the works.

Year Project Name Cost Description
2013 Onieda Rd/Rincon $512,536 Main extension — add 2,200′ of 20″ ductile iron to increase flow to tanks/install 2 hydrants
2013 Rancherias Easement phase 1 & 2 from Lions park to Hopi $985,677 upsize 12″ steel to 20″ ductile, 3,260′/1,806′ of 8″ PVC/install 7 hydrants
2013 Arcata/Lodema main replacement $672,326 install 7,000′ of 6″ and 8″ PVC/add 4 hydrants
2013 Riverside Drive main replacement $693,273 upsize 5,633′ of 6″ steel to 8″ PVC/install 7 new hydrants and pressure relief station
2014 Future water supply $1,300,000 280 acre-feet of water rights
2014 Standing Rock Phase 1 & 2 main replacement $1,297,974 upsize 4,614′ of 12″ steel to 20″ ductile iron pipe/install 9 hydrants
2014 Carlisle/Allegheny/Rimrock main replacement $781,782 upsize 7,900′ of 4″, 6″, and 8″ steel to 8″ PVC and 12″ ductile iron pipe install/install 10 hydrants
2014 Tract 4053 North Symeron/Cocoqui $520,967 upsize 6″ steel to 8″ PVC/install 5 hydrants
2014 Kiowa/Bear Valley main replacement $355,328 replace 12″ steel with 12″ ductile iron pipe/install 2 hydrants
2014 Rancherias/Hopi to Kiowa main replacement $805,036 Replace 2,145′ of 12″ steel with 16″ and 20″ ductile iron pipe. Add 1,074′ of 8″ PVC/install 6 hydrants
2014 Navajo Rd main extension $199,981 Add 817′ of 12″ ductile iron pipe as part of town road refurbishing project/install 1 hydrant
2014 Ramona/Nanticoke to Central main replacement $517,105 upsize 2,867′ of 6″ steel to 12″ ductile iron pipe/install 7 hydrants. Part of AVUSD safe passage to school road project
2014 Wika Rd main replacement $649,441 upsize 1,520′ of 4″ and 6″ steel pipe to 12″ ductile iron pipe in preparation for town road project/install 7 hydrants. (Night work due to hospital traffic)
2015 Standing Rock phase 3 main replacement $575,151 upsize 12″ steel to 20″ ductile iron pipe/install 3 hydrants
2015 Mondamon/Apple Valley Rd main replacement $1,029,301 upsize 3,563′ of 12″ steel to 20″ ductile iron pipe/add 5 hydrants
2015 Idaho/Mondamon main replacement $698,192 Upsize 7,000′ of 6″ steel to 8″ PVC/install 10 hydrants
2015 Rincon phase 1 $571,682 upsize 2,567′ of 12″ steel to 20″ ductile iron pipe/install 3 hydrants
2015 Venango/Acoma/Resoto/Allegheny main replacement $625,000 6,970′ of 6″-8″: PVC pipe. 8 fire hydrants, effecting 33 water services
2015 Well 35 $1,300,000 efficient new well to replace several inefficient wells that are due for retirement (total cost $2.2 million)
2015 Nanticoke Road $475,000 3,168′ of 8″ pipe, 1,202′ of 6″ pipe, and add six fire hydrants and 45 new services
2015 Seneca Road $140,000 replace 200′ of 4″ steel main with 12″ ductile iron pipe and adding 610′ of 12″ main, as well as installing a fire hydrant
2016 Well 35 $900,000 efficient new well to replace several inefficient wells that are due for retirement (total cost $2.2 million)